2024-05-29

Meihekou - Huadian natural gas branch pipeline project

Total length: 110.91 kilometers

Pipe diameter: 323mm,

Welded joints: 9251

Suhigo's equipment: Anti-corrosion equipment

 

Suhigo mechanical anti-corrosion equipment has excellent performance and reliability, and can adapt to the cold and low temperature environment in northern winter; And participated in Jihua Group Jilin City North Construction Co., LTD. - Meihekou - Huadian natural gas Branch pipeline project, with a total length of 110.91 kilometers, pipe diameter of 323mm, and 9251 welded joints